4.3‘‘ colour TFT display: 1800 series
Modern digital technology and safety current limitation for unproblematic workspace designs.
Services
Customized
Pre-owned devices
Company
Intensive quality assurance is indispensable especially for explosion-proof products. Therefore, the explosion-proof luminaires must undergo a safety and function test.
Industry: luminaires
The outdated manual test stations of our customers should be replaced by modern testing systems that are automated as far as possible. High flexibility and quick refitting to mains-operated and battery-operated linear fluorescent luminaires was important there. In addition to process safety, documentation of the test was an essential requirement. The whole concept must meet the stringent requirements for explosion-proof products.
In cooperation with our customers, a PC-controlled testing system was developed. The workplace design was a key factor in the process. Handling as well as the cycle time could be optimised by the use of an approved safety light curtain. The system was equipped with several original luminaires for the function test. Thus, real test conditions were created. The luminaires were stored in a drawer beneath the workplace, thus allowing easy and quick replacement at any time.
The standard software DAT not only controls the testing process but also guides the user through the entire process. The PC software DAT is a complete WINDOWS-based quality system. Anyone, who can turn on a PC will be able to operate the tester.
The function test is carried out by measuring the power consumption following the safety tests in accordance with the globally valid standards (IEC, EN, UL, VDE etc.) Following this, subjective tests of any kind are possible.
An arbitrary number of test programs can be stored in the testing system PC. This allows the customer to independently write new test programs while developing new products. However, for products with identical data, it is also possible to use the same test program, which is then allocated to the respective DUT over the product list. The test results are stored automatically in XML or Access format on an arbitrary place on the network.
A separate test dummy is used to check the functionality of the testing system fully automatically. During the daily start of the testing system, the testing personnel is asked to connect this dummy and start the corresponding program. The testing system does not allow further testing without a passed dummy test.